Tonomia — Distributed AI Factories | Affordable AI for Everyone
Sustainable AI Economy

Affordable AI
for Everyone,
Powered by Tonomia

Distributed AI factories — compact, renewable-powered, ready in 12 weeks. Sovereign compute at 4.5× lower cost than traditional data centers, closer to energy, users, and real-world impact.

300kW
TonoForge™
€2.5M
Per MW
12 wk
Deploy
~5×
Lower Cost
1.05
PUE
Tier ∞
Always On
Tonomia AI Factory — distributed AI infrastructure
01 · Why Decentralized?

AI factories at the Core & the Edge

The AI Infrastructure is suffering

Traditional data centers are too expensive, too slow, and grid-constrained. Only hyperscalers can afford to build them.

€10–15M/MW, 3–5 years to build, 4+ year grid queues in EMEA. Rents growing at 6–7% every year with no ceiling.

$11.3M
Per MW · JLL 2026 avg build cost
4+ yr
EMEA grid wait · Amsterdam paused 2028
$222
AMER colo 2030 · +7% CAGR
57%
Projects delayed 3mo+ in 2025
€10–15M/MW3–5 Year BuildGrid Dependent
Shift

The Tonomia Remedy

Distributed AI factories co-located with renewable energy — modular from 0.15 MW to 1.2 MW. Deployable on any flat surface in 12 weeks. No grid upgrade needed.

€2.5M/MW · 12 weeks · PUE 1.05 · €25/kW/mo ownership · 80% heat recovery.

€2.5M
Per MW · Mode A infra
12 wk
Deploy after order
€25
Per kW/mo · own vs lease
1.05
PUE · vs 1.4–1.8 typical
€2.5M/MW12 WeeksPUE 1.05No Grid Upgrade
02 · Products

Three products. One stack.

TonoForge™ modular AI factory
Core Network · ISO Container · 20ft or 40ft
TonoForge™

The 300 kW containerised AI factory. AMD MI355X or NVIDIA GB300 NVL72, liquid cooling, LFP battery (4h backup, 2× amplification), and TonoFabric™ orchestration — pre-integrated at the factory.

Up to 144 GPUs per unit. Deploy on any flat surface in 12 weeks. No grid upgrade. 80% heat recovery creates a revenue stream from day one.

300kW
Power
144
GPUs
1.05
PUE
80%
Heat Rec.
4h
Battery
TonoEdge™ edge AI module
Edge Network · Street Cabinets · Enterprise
TonoEdge™

AI at the last mile — central offices, street cabinets, enterprise sites. Compact 3 kW module. Sub-millisecond latency. 1,000 users/node.

Pairs with TonoForge core deployments to form a complete distributed AI network. Targets the 37% AI inference wave arriving in 2027 (JLL 2026).

3kW
Module
1,000
Users
<1ms
Latency
TonoFabric™ orchestration
Enterprise Software · Fleet Orchestration
TonoFabric™

Enterprise-grade orchestration OS — workload distribution, energy optimisation via reinforcement learning, security, fleet monitoring, DCIM. Single pane of glass at any scale.

15%+ operational efficiency gain through RL-based optimisation. Active in 20+ countries with AI energy optimization incentive programs (JLL 2026).

Fleet
Management
RL
Optimise
15%+
Efficiency

Tier “Infinite” Compute

Self-healing · Multi-path failover · No grid redundancy needed · Always on — across every TonoForge and TonoEdge node.

03 · Resilience

Tier “Infinite” Compute

Each factory operates independently yet interconnected — high redundancy, multi-path failover, decentralised capacity eliminating single points of failure. Dynamic workload redistribution without interruption. No costly grid power redundancy required.

Self-Healing Multi-Path Failover Always On No Grid Redundancy EU Sovereign
TonoForge™ distributed network
04 · Value Chain

From GPU silicon to consumer AI

End-to-end vertically integrated — every layer designed, built, and operated by Tonomia and its partners.

Step 01
🔲
GPU Compute
AMD · NVIDIA
Step 02
🖥
Servers
MiTAC · Supermicro · Dell
Step 03
🏭
TonoForge™
AI Factory · 0.6–1.2 MW
Step 04
📡
Network
Telcos · Proximus
Step 05
🧠
TonoFabric™
Orchestration OS
Step 06
💬
Toomi™
Consumer AI · €5–9/mo
Toomi™ sovereign AI assistant
05 · Consumer AI
Toomi™
“Twin me, infinitely!”

Sovereign AI assistant — 16 of 18 benchmark features at a fraction of the price. EU-hosted, GDPR-native, running on Tonomia’s own infrastructure.

Provider 1
USA€25/mo
Provider 2
France€25/mo
Provider 3
USA€20/mo
Toomi™
🇧🇪€5–9/mo
Model agnostic
Text translation
Doc translation
Audio/video transcription
Image analysis
Image generation
Report generation
Code execution
Extensions
Bot customization
RAG grounded
Web search
06 · Market Context · JLL 2026 Global Data Center Outlook

Four reasons the market needs TonoForge™

Every chart below is sourced from the JLL 2026 Global Data Center Outlook (January 2026). TonoForge positioning overlaid in green.

JLL Research · Jan 2026
DC Construction Cost · Shell & Core
$ millions per MW · land & IT excluded · 2026 average
$0 $5M $10M $15M $20M avg $11.3M $14 $12 $11 AMER $14 $13 $12 EMEA $18 $15 $12 APAC €2.5M TF™ Infra Market (shell & core only) TonoForge™ infra
TonoForge Mode A at €2.5M/MW is 4.5× below the JLL 2026 global average — and that’s before IT fit-out (adds $25M/MW) which TonoForge Mode B includes.
Market pain · JLL 2026
$11.3M/MW
Global average DC build cost (shell & core only, land & IT excluded). +7% CAGR since 2020.
TonoForge answer
€2.5M/MW
Infra only (Mode A) · €750K per 300 kW unit · GPU-agnostic · EXW Battice, Belgium
Mode B · all-in AI factory
€25M/MW
128 GPUs included · vs $40–50M/MW market all-in · 2× below market
JLL Research · Jan 2026
Colo Lease Rates 2025–2030
$/kW/month · 1–20 MW · TonoForge = ownership not lease
$0 $50 $100 $150 $200 $250 $222 AMER +7% $207 EMEA +6% $179 APAC +4% €25/kW/mo — TonoForge™ ownership $158 $152 $150 2025 2026 2027 2028 2029 2030 Source: JLL Research
By 2030, even the cheapest colo region (APAC $179/kW/mo) costs 7× more than TonoForge ownership. The 8× AMER gap compounds every year you lease vs own.
JLL Research · Jan 2026
DC Equipment Lead Times 2026
Weeks · EMEA · global avg 33 wks · 57% of projects delayed 3mo+ in 2025
0 30 60 90 110 33wk avg 100wk 80wk 52wk 48wk 30wk 30wk 18wk 12wk factory-built Transformer Generator Switchgear Chiller BESS RDHx PDU/STS TonoForge™ EMEA items above avg TonoForge™ factory-integrated · no customer procurement
EMEA transformers take 100 weeks. TonoForge pre-integrates everything at the factory — the customer receives a commissioned unit in 12 weeks with zero supply chain risk.
JLL Research · Jan 2026
Total Global DC Workloads 2020–2030
GW total · AI = 50% of all workloads by 2030
0 50 100 150 200 37% inference 13% training 50% traditional 9% 14% 77% 2020 2025 2030 Source: JLL Research · inference overtakes training in 2027
AI inference overtakes training in 2027. By 2030 it’s 37% of all workloads — distributed, latency-sensitive, needs to be close to users. TonoForge is built for exactly this deployment model.
JLL Research · Jan 2026
Modular DC Market Size
$ billions · annual global revenue · 35% CAGR
2025 $11B 2030 $48B 35% CAGR TonoForge™ in the $48B modular DC supercycle 15,000+ micro DCs by 2028 · 70% liquid-cooled by 2027
Modular DC market grows 4.4× in 5 years. TonoForge is the ISO-containerised format purpose-built for this transition from build-to-suit to assemble-at-scale.
JLL / BloombergNEF · 2026
Global BESS Capacity
GWh gross · 4× growth 2023–2026 · below $90/kWh in 2026
0 90 180 270 360 90 2023 183 2024 248 2025 360 2026 TonoForge LFP strategy built on this cost curve · GWh
BESS capacity 4× in 3 years, price below $90/kWh. TonoForge’s LFP 2× amplification is commercially optimal now — 150 kW grid in, 300 kW AI out. No grid upgrade.
JLL Research · Jan 2026
Global DC Supply Forecast 2020–2030
GW total · 14% CAGR base case · nearly 100 GW new capacity by 2030
0 50 100 150 200 Hyperscale 70GW Leased 105GW On-prem 25GW 2020 2025 2030 Source: JLL Research · 14% CAGR base case · $1.2T real estate value creation
Global DC capacity doubles to 200 GW by 2030, requiring ~$3 trillion in investment. Distributed modular deployments capture the speed-to-power advantage that centralised builds cannot match.
Full Market Analysis & Charts → 6 detailed charts · full benchmark table · JLL 2026 data
07 · Use Cases

AI infrastructure for every sector

Telecom
Telecom & Operators

AI at central offices and PoPs. Edge inference, network optimization, AI-as-a-Service.

400 Gbps connectivity
Healthcare
Healthcare & Bio-pharma

AI diagnostics, drug discovery, medical imaging. Sovereign GDPR infrastructure.

+35% diagnostic accuracy
Manufacturing
Industry & Manufacturing

Predictive maintenance, quality control, process optimization. On-premise.

+28% productivity
Education
Education & Research

Sovereign compute for universities. Personalized tutoring, accelerated R&D.

×2.5 R&D acceleration
Agriculture
Agriculture & Agri-tech

Precision farming, yield prediction, disease detection at farm level.

+18% yield improvement
Government
Government & Public

AI chatbots, document processing, e-government. Full digital sovereignty.

−60% processing time

Ready to deploy AI in your sector?

Operator, enterprise, government, or investor — deploy in 12 weeks from order.

08 · Roadmap

Product Deployment Timeline

2026
TonoForge™
300 kW AI Factory
Distributed AI factories at renewable energy sites across Belgium. First units deploying now.
Farms · Biomethanisation Sites · Telecom PoPs
2027
TonoPark™
Solar Parking + AI
Combined solar parking with integrated AI computing and heat recovery.
Municipal Swimming Pools · Parking Lots
2027
TonoEdge™
3 kW Edge AI Module
Compact edge modules at network periphery for ultra-low latency AI inference.
Street Cabinets · Enterprises · Residential
€2.5M
per MW
vs $11.3M market avg
30+
patents filed
22 on AI infra
100K
users/factory
1,000/GPU
1.05
PUE target
vs 1.4–1.8 typical
less than colo 2030
vs $207/kW/mo
Ecosystem

Partners in AI Infrastructure

Get Involved

The AI Infrastructure Revolution
Starts Here

Operator, enterprise, government, or investor — the window to lead distributed AI infrastructure is open now.

$11.3M/MWavg DC build cost · JLL DC Report 2026·€2.5M/MWTonoForge™
4+ yrEMEA grid queue·12 wkTonoForge™ deploy
$207/kW/moEMEA colo 2030·€25/kW/moTonoForge™ ownership
$48Bmodular DC market 2030 · 35% CAGR · JLL
37%AI inference workloads by 2030 · JLL
57%projects delayed 3mo+ in 2025 · JLL
$11.3M/MWavg DC build cost · JLL 2026·€2.5M/MWTonoForge™
4+ yrEMEA grid queue·12 wkTonoForge™ deploy
$207/kW/moEMEA colo 2030·€25/kW/moTonoForge™ ownership
$48Bmodular DC market 2030 · 35% CAGR · JLL
37%AI inference workloads by 2030 · JLL
57%projects delayed 3mo+ in 2025 · JLL